Palmetto Pointe Boulevard Extension to SC Highway 544, Horry County, SC (Horry County Ride III)- Horry County is extending Palmetto Pointe Boulevard from its existing terminus, through the SayeBrook West Planned Development District, to the intersection of SC Highway 544 and Big Block Road. Palmetto Pointe Boulevard is a two-lane arterial road providing access to Palmetto Pointe that starts at U.S. Highway 17 and runs west approximately 2 miles to where it dead ends. This extension will be part of the SayeBrook roadway network, intersecting with the main development spine road, Sheffield Parkway, that will provide a connection from U.S. Highway 17 at Coventry Road to Highway 544 and Big Block Road.
Roadway improvements include construction of the four-lane divided Sheffield Parkway from Highway 544 west approximately 0.5 miles. Two (2) roundabouts will be constructed along with Sheffield Parkway at planned intersections within SayeBrook. Palmetto Pointe Boulevard will extend from its current point of termination at the SayeBrook property boundary to the second roundabout at the end of the spine road.
Project includes, but is not limited to, clearing, earthwork excavation, utility and storm drain installation, construction of roadways with concrete curb and gutter, sidewalks, and improvements within the SC Highway 544 right-of-way and traffic signal upgrades.
Palmetto Pointe Boulevard Extension opened to the public on November 27th, 2019.
Roadway improvements include construction of the four-lane divided Sheffield Parkway from Highway 544 west approximately 0.5 miles. Two (2) roundabouts will be constructed along with Sheffield Parkway at planned intersections within SayeBrook. Palmetto Pointe Boulevard will extend from its current point of termination at the SayeBrook property boundary to the second roundabout at the end of the spine road.
Project includes, but is not limited to, clearing, earthwork excavation, utility and storm drain installation, construction of roadways with concrete curb and gutter, sidewalks, and improvements within the SC Highway 544 right-of-way and traffic signal upgrades.